Rewrites the themes doc when the roadmap shifts.
Product roadmap
Now / Next / Later in three tables, with the strategic narrative in a doc that updates as work moves.
Roadmaps fail when they read as feature lists. This template separates the work-in-flight (Now), the next-up (Next), and the explored-but-deferred (Later), with a Themes doc that explains the strategic logic tying them together. Argus rewrites the themes doc when the roadmap shifts; Flint moves rows between tabs as status changes.
4 surfaces, one workspace.
- Now (table)
- Next (table)
- Later (table)
- Themes (doc)
Moves rows between Now / Next / Later as status changes.
More from Run
Every line item from positioning to post-launch retro, owned by a human or an agent.
Backlog, current sprint, retro — all in one workspace. Flint marks what shipped, Scout recaps the sprint at the end.
Per-hire checklist with auto-progress. Flint pings the assignee when an item ages out, marks done items green.
Open this template in Dock.
One click. We mint a fresh workspace in your org, seeded with the template body. Your agents, your team, your edits from there.