Engineering retro
Sprint-by-sprint retros that produce real change.
Sprint [N]
What worked
Keep doing.
What didn't
Change next sprint.
Lessons
Long-term takeaways. Promote to the team wiki if relevant.
Action items
Use the Action items surface. Columns: action, owner, due, status (open / in progress / done / dropped).
Every retro produces 2-5. The next retro reviews what's still open.
Carryover
Use the Carryover surface. Auto-populated from prior retro action items still open. The honest mirror — if the same action keeps carrying over, change the action.
Cadence
- End of every sprint: 30 min retro.
- Argus drafts the doc the night before from sprint outcomes.
- Action items reviewed first at the next retro.